Martinus Rail
Martinus engaged Meccanico for the demolition of an existing wall inside Britomart Tunnel in Auckland CBD. Scope of works consisted of jacking to transfer load from the existing wall to a newly constructed wall, continuous monitoring of deflections, and design of all associated temporary works. Meccanico engaged Quoin to develop the temporary works design in collaboration with Martinus, Aurecon and City Rail Link Ltd. and developed the jacking methodology in accordance with the permanent works design requirements. The jacking works were completed successfully as critical path works during a rail shutdown with a very happy client as a result.
Throughout the works, it has been great to work with Meccanico as a trusted partner to deliver a robust solution, work to the program, and produce solutions where required. Impressed with the ability and flexibility of the team to get the job done. It was a pleasure to work with Rod & team!