Situation

The scope of the project required full strip out, re-strengthening and refurbishment to be completed in just four months. The hotels Lincoln wing and Roosevelt wing were damaged from the main February 2011 earthquake. New foundations, block walls and structural steel were installed to bring the wings back up to 67% of the NBS, so they could be reoccupied. The project was very challenging due to the compressed timeframe, but our team delivered in every aspect.

TESTIMONIALS