Situation
The structural integrity of this 100 tonne bridge had been compromised as it sat within the sea spray zone. Because of this the bridge needed some major maintenance and repairs.
Solution
Meccanico were able to assist with carrying out the repairs using our heavy lifting, synchronised equipment. We lifted the structure in place, for approximately eight months so that the sandblasting, new paint and repairs could be completed easily and safely.